
Arizona electrical license classes
which Arizona
electrical license
do you need?
C‑11, R‑11 and CR‑11, side by side, in plain English.
get startedMARKETS WE PLACE THROUGH
the short answer
Arizona splits electrical contracting into three Registrar of Contractors classes: C‑11 for commercial work, R‑11 for residential work, and CR‑11 for both on one license. The C‑11 scope covers electrical work below 600 volts and draws set lines around work in the public right of way.
the Arizona electrical classes.
Every electrical class the ROC licenses, in plain words.
- C‑11
Commercial electrical. Installing, altering and repairing wiring and equipment below 600 volts, including outside, overhead and underground work. Public right of way work is limited by the published scope.
- R‑11
Residential electrical. Work on homes and what’s attached to them on the property. It’s the residential half of CR‑11.
- CR‑11
Dual electrical. The C‑11 commercial and R‑11 residential scopes on one license.
- Bond
Required for every class. Residential: $4,250, or $7,500 at $375,000 a year or more. Commercial: $2,500 to $50,000 by yearly volume. A CR‑11 combines both amounts.
how Arizona bonds work
Sources: Arizona Registrar of Contractors, A.R.S. §32-1152. Last reviewed September 2026.
find your class.
Tap the kind of work you take on to see the class that fits it.
The work
homes.
R‑11. Residential electrical work on homes and the property around them.
Who asks: Service and remodel shops that stay on residential jobs.
The work
commercial.
C‑11. Commercial electrical work below 600 volts, with limits on public right of way work.
Who asks: Contractors who wire commercial buildings or sub to commercial GCs.
The work
both.
CR‑11. The commercial and residential scopes on one license, with both bond amounts combined.
Who asks: Shops that move between homes and commercial jobs.
what to know before
you bid in Arizona.

Voltage draws the line.
The C‑11 scope stops below 600 volts and limits public right of way work, so the word electrical doesn’t cover every job. Tell us what you install, repair and test so the policy describes the same work.

A bond isn’t insurance.
Your ROC bond is a licensing requirement that protects the public. It isn’t liability insurance, and it doesn’t pay when your work damages a customer’s property.
good to know.
Straight answers on Arizona electrical licenses.
What electrical license do I need in Arizona?
What is the difference between Arizona C-11, R-11 and CR-11?
Does my Arizona contractor bond cover damage to a customer’s property?
Sources: Arizona Registrar of Contractors, A.R.S. §32-1152. Last reviewed September 2026.
Insurance words, in plain English: waiver of subrogation · certificate of insurance · additional insured · primary and noncontributory · hold harmless agreement · contractual liability · per-project aggregate · completed operations
more for Arizona
electrical contractors.
Go back up, or see the same guide for other trades.

see what your
program is missing.
Most have gaps. Find yours with a policy review.
get startedor call 802-GOT-RIZA