completed operations.
Completed operations coverage responds to injury or damage caused by your work after you’ve finished the job and left, like a fitting that fails months later.
What does completed operations mean?
It means injury or damage caused by your work after you’ve finished and left the job. A fitting that fails months later, a railing that gives way after the owner moves in, a short that starts a fire next year: those are completed operations claims, and they’re part of most general liability policies.
When is work considered completed?
Under the standard general liability policy, when everything in the contract is done, when everything at that site is done, or when that part of the work is being used for its intended purpose by someone other than another contractor on the project. Work that still needs correction or repair counts as completed once it’s otherwise done.
Which policy pays a completed operations claim?
The general liability policy in force when the injury or damage happens, not the one you had when you did the work, because most contractor general liability is written on an occurrence basis. That’s why keeping coverage continuous, and keeping old policy records, matters for years after a job.
What is the products and completed operations aggregate?
It’s a separate annual limit on a general liability policy for claims from your finished work and products. It’s apart from the general aggregate, so a year of jobsite claims doesn’t use up the limit for claims from finished work, and the other way around.
Why do general contractors ask for completed operations coverage for years after a job?
Because claims from construction can show up long after the work, and the law in most states allows them for years. Contracts often ask you to keep completed operations coverage, and the general contractor’s additional insured status for completed work, for a set number of years after the project ends.
What is a completed operations additional insured endorsement?
It extends additional insured status to claims from your finished work, commonly with the CG 20 37 endorsement. The usual ongoing operations endorsement ends when your work is done, so contracts that want protection after completion need this one too.
Does completed operations cover fixing my own faulty work?
Generally no. It covers injury and damage your finished work causes to other people and other property. The cost to redo your own work is usually excluded, though damage to other parts of a building caused by your work can be covered, depending on the policy and the state’s case law.
What happens to completed operations coverage if I retire or close the business?
If you stop carrying general liability, there’s no occurrence policy in force when a later claim happens. Some contractors buy a discontinued operations policy to cover claims from past work after they close. It’s worth sorting out before the last policy lapses.
Is completed operations excluded on some policies?
Yes. Some policies exclude or limit it for certain work, like residential construction, condos, roofing or exterior insulation systems. A policy can look fine on the certificate and still have an exclusion that matters for the work you do most.
How long can someone sue me after a job is finished?
It depends on the state. Most states have a construction statute of repose that sets an outer limit measured from completion, commonly somewhere between several years and more than a decade, and some have none. The notes below cover Riza’s licensed states in detail and every other state in a line.
in the states where Riza is licensed.
Riza is a licensed insurance agency in New York, Colorado, Texas, Florida, Massachusetts, Arizona, Nevada, North Carolina, New Jersey and Georgia. Notes below cite the law they come from. Detailed write-ups cover Arizona, Nevada, Texas, North Carolina and New York. One-line notes for other licensed states appear with them when this term has one.
- ArizonaArizona bars contract-based claims, including implied warranty claims, against builders and designers more than eight years after substantial completion, or nine if the defect first shows up in the eighth year. It doesn’t cover injury or death claims. Property damage claims in tort have a two-year limit from discovery, and on homes, owners have to give pre-suit notice and a chance to repair.A.R.S. § 12-552 · A.R.S. § 12-1362contractors in Arizona →
- NevadaNevada bars suits over a construction deficiency more than 10 years after substantial completion, covering property damage, injury and death. Claims based on fraud have no limit. On homes, the owner has to give pre-suit notice and a chance to repair, and that process pauses the clock.NRS ch. 11 (11.202, 11.2055) · NRS ch. 40 (40.600 to 40.695)contractors in Nevada →
- TexasTexas bars suits against builders and designers more than 10 years after substantial completion, eight for government owners, and six on homes where the builder gave a qualifying written warranty. A claimant injured in the last year gets two more years, and the bar doesn’t protect willful misconduct or fraudulent concealment. On homes, owners have to give 60 days’ written notice and a chance to inspect before suing.Tex. Civ. Prac. & Rem. Code ch. 16 · Tex. Civ. Prac. & Rem. Code § 16.009 (texas.public.law)contractors in Texas →
- North CarolinaNorth Carolina bars claims over a defective improvement more than six years after the later of the defendant’s last work or substantial completion, for homes and commercial work alike. The bar doesn’t protect fraud or willful or wanton negligence. Within the six years, claims generally have three years from when the damage becomes apparent.N.C.G.S. § 1-50 · N.C.G.S. § 1-52contractors in North Carolina →
- New YorkNew York has no construction statute of repose, so there’s no fixed date after which a contractor is safe. An owner’s claim against a builder generally runs from completion, but a person injured years later has three years from the injury, which is why completed operations claims in New York can arrive long after a job.CPLR 214 · City School Dist. of Newburgh v. Hugh Stubbins & Assocs. (N.Y. 1995)contractors in New York →
- ColoradoColorado bars claims against contractors, builders and designers 6 years after substantial completion, or up to 8 if the claim arises in year 5 or 6, and its CDARA law requires notice before suit.C.R.S. § 13-80-104 (Colorado Public Law) [secondary] · C.R.S. § 13-20-803.5 CDARA notice of claim (Colorado Public Law) [secondary]
- FloridaFlorida requires construction defect suits within 4 years of the certificate of occupancy, completion or abandonment, or of discovering a latent defect, never more than 7 years after, with pre-suit notice under chapter 558.Fla. Stat. § 95.11 (2026) (Florida Legislature) · Fla. Stat. § 558.004 (Florida Legislature)
- GeorgiaGeorgia bars suits over a deficient improvement 8 years after substantial completion, up to 10 for injuries in year 7 or 8, and a 2020 change exempts newer contract and warranty claims from that bar.O.C.G.A. § 9-3-51 (Justia) [secondary] · Southern States Chemical v. Tampa Tank & Welding (Ga. 2023): 2020 amendment not retroactive (LGWM summary) [secondary]
- MassachusettsMassachusetts bars tort claims over deficient design or construction 6 years after the improvement opens to use or is substantially complete and occupied, with no fraud carve-out or final-year extension in the text.M.G.L. c. 260, § 2B (Massachusetts Legislature)
- New JerseyNew Jersey bars suits over defective and unsafe construction 10 years after the work, which courts count from substantial completion of the whole project, with no extra time for an injury in the final year.State v. Perini Corp. (N.J. 2015) - NJ Courts opinion · N.J.S.A. 2A:14-1.1 text (FindLaw) [secondary]
every other state.
How it works everywhere else, with the rule each line comes from. Riza is not licensed in these states.
- AlabamaAlabama bars most suits against architects, engineers and builders 7 years after substantial completion, unless the builder knew of the defect and didn’t disclose it, and claims must also come within 2 years of the damage.Ala. Code § 6-5-221 (Justia) [secondary] · ALFA International construction compendium: Alabama [secondary]
- AlaskaAlaska bars injury and property damage suits 10 years after substantial completion or the last act causing harm, whichever is first, with exceptions for fraud, gross negligence and concealed defects; homes also carry a pre-suit notice law.Alaska Stat. § 09.10.055 (Alaska Legislature) · Alaska Stat. §§ 09.45.881-.899 (Alaska Legislature)
- ArkansasArkansas bars contract claims over construction defects 5 years after substantial completion and injury claims after 4, with 1 extra year for a late injury capped at 5, and the caps don’t cover fraudulent concealment.Ark. Code Ann. § 16-56-112 (FindLaw) [secondary] · White and Williams nationwide limitation and repose chart (Dooley; Platinum Peaks) [secondary]
- CaliforniaCalifornia sets a 10-year outer limit from substantial completion for latent defects and 4 years for obvious ones, excludes willful misconduct and fraud, and new homes follow SB 800’s own limits and pre-suit repair process.Cal. Civ. Proc. Code § 337.15 (California Legislative Information) · Cal. Civ. Proc. Code § 337.1 (California Legislative Information) · Cal. Civ. Code § 941 (California Legislative Information)
- ConnecticutConnecticut’s 7-year repose after substantial completion covers only architects, engineers and surveyors; claims against contractors instead run under general tort and contract limitation periods, which fraudulent concealment can extend.Conn. Gen. Stat. ch. 926 incl. §§ 52-576, 52-577, 52-584, 52-584a, 52-584c, 52-595 (Connecticut General Assembly)
- DelawareDelaware bars contract and tort claims against builders and designers 6 years after the earliest of completion, final payment or acceptance, though the statute appears to exclude homes and how courts read that is unclear.10 Del. C. ch. 81 incl. §§ 8106, 8119, 8127 (Delaware Code Online) · White and Williams nationwide limitation and repose chart ("non-residential property") [secondary]
- District of ColumbiaThe District of Columbia bars tort claims over a defective improvement unless the injury occurs within 10 years of substantial completion; the rule doesn’t cover contract claims and has no fraud exception or final-year extension.D.C. Code § 12-310 (D.C. Council Code)
- HawaiiHawaii bars construction defect suits on any legal theory more than 10 years after completion, as a 2025 law confirmed, and its Contractor Repair Act requires notice at least 90 days before suing.HB 420 CD1 (2025), amending HRS 657-8 and ch. 672E, Hawaii State Legislature · Office of the Governor news release: HB 420 signed as Act 308, July 9, 2025
- IdahoIdaho deems an unaccrued tort claim to accrue 6 years after final completion, after which the ordinary limitation period runs, so the practical outer limit is about 8 years; a notice and repair law covers residences.Idaho Code § 5-241, Idaho Legislature · Idaho Code § 6-2503 (Notice and Opportunity to Repair), Idaho Legislature
- IllinoisIllinois requires construction claims within 4 years of discovery and generally within 10 years of the act or omission, but a problem found before year 10 still gets 4 years, and fraud and longer warranties are excepted.735 ILCS 5/13-214, Illinois General Assembly
- IndianaIndiana bars suits against designers and builders 10 years after substantial completion or 12 years after plans were delivered, with 2 more years for injuries in year 9 or 10, and requires residential pre-suit notice.IC 32-30-1-5 (FindLaw) [secondary] · IC 32-30-1-6 (FindLaw) [secondary] · IC 32-27-3-2 (FindLaw) [secondary]
- IowaIowa bars claims 8 years after the act or omission for nonresidential work and 10 years for residential work built since July 2017, extended to 15 years for fraud or intentional misconduct.Iowa Code § 614.1 (2026), Iowa Legislature
- KansasKansas has no construction-specific repose; its general tort rule bars claims 10 years after the act that caused them, contract claims run on their own limits, and a residential defect law requires notice first.K.S.A. 60-513, Kansas Office of Revisor of Statutes · K.S.A. 60-4701 (Residential Construction Defect Act definitions), Kansas Revisor
- KentuckyKentucky’s statute still lists a 7-year repose after substantial completion, but courts struck earlier versions and the current one is widely treated as unenforceable, so ordinary limitation periods mostly govern.KRS 413.135, Kentucky Legislature · Perkins v. Northeastern Log Homes, 808 S.W.2d 809 (Ky. 1991), CourtListener
- LouisianaLouisiana gives 5 years from the recorded acceptance of the work, or occupancy, to sue contractors and designers, or 6 for an injury in year 5, a period that can’t be suspended and doesn’t apply to fraud.La. R.S. 9:2772, Louisiana State Legislature
- MaineMaine has no statute of repose for contractors or builders, so claims against them run under the general 6-year limitation period, while architects and engineers get a 10-year cap from substantial completion.14 M.R.S. § 752-A, Design professionals (Maine Legislature) · 14 M.R.S. § 752, Six years (Maine Legislature)
- MarylandMaryland bars claims against architects, engineers and contractors that accrue more than 10 years after the improvement first becomes available for use, or 20 years for others, and suit then has 3 years.Md. Code, Cts. & Jud. Proc. § 5-108 (Maryland General Assembly)
- MichiganMichigan bars claims against licensed architects, engineers and contractors 6 years after occupancy, use or acceptance, or within 1 year of discovery, capped at 10 years, when gross negligence caused the defect.MCL 600.5839 (Michigan Legislature)
- MinnesotaMinnesota bars claims that accrue more than 10 years after substantial completion, allows up to 12 for claims arising in year 9 or 10, excepts fraud, and requires residential defect notice within 6 months.Minn. Stat. § 541.051 (MN Revisor of Statutes) · Minn. Stat. § 327A.03 (MN Revisor of Statutes)
- MississippiMississippi bars property damage and injury claims against designers and builders 6 years after written acceptance or occupancy, excluding wrongful death, and whether fraudulent concealment extends that period is unclear.Miss. Code Ann. § 15-1-41 (Justia) [secondary]
- MissouriMissouri bars claims against those who only designed, planned or built an improvement 10 years after completion, but not where the defect was concealed, and residential work requires written notice before suit.Mo. Rev. Stat. § 516.097 (Missouri Revisor of Statutes) · Mo. Rev. Stat. § 436.356 (Missouri Revisor of Statutes)
- MontanaMontana has barred design and construction claims 6 years after completion since October 2025, down from 10, with 1 extra year for an injury in year 6; how this applies to older projects is unclear.Mont. Code Ann. § 27-2-208 (2025 MCA, Montana Legislature) · Montana Legislative Review 2025 (SB 143 = Ch. 174, eff. 10/01/2025)
- NebraskaNebraska requires construction and warranty claims within 4 years of the act, or 2 years from discovery when found later, never more than 10 years after the act, and condominiums have shorter periods.Neb. Rev. Stat. § 25-223 (Nebraska Legislature)
- New HampshireNew Hampshire bars suits over defective design or construction 8 years after substantial completion, longer under a longer written warranty, with no bar for fraud, and residential claims need 60 days’ notice.N.H. RSA 508:4-b (NH General Court) · N.H. RSA 359-G:4 notice and opportunity to repair (NH General Court)
- New MexicoNew Mexico bars injury and property damage suits over a defective improvement 10 years after substantial completion, unless a contract or warranty says otherwise, with no fraud or final-year exception that we found.NMSA § 37-1-27 (Justia) [secondary]
- North DakotaNorth Dakota bars contract, tort and other construction defect suits 10 years after substantial completion, or 12 for an injury in year 10, and residential warranty claims need written notice within 6 months.N.D.C.C. ch. 28-01, incl. § 28-01-44 (ND Legislative Branch PDF) · N.D.C.C. ch. 43-07, incl. § 43-07-26 (ND Legislative Branch PDF)
- OhioOhio bars contract and tort claims over a defective improvement 10 years after substantial completion, about 12 for defects found late, unless fraud is involved, and residential work requires 60 days’ notice before suit.Ohio R.C. 2305.131 (Ohio Laws and Administrative Rules) · Ohio R.C. Chapter 1312 (Ohio Laws and Administrative Rules)
- OklahomaOklahoma bars tort claims over defective design or construction 10 years after substantial completion of the specific improvement, while contract claims follow the 5-year written contract limit instead.Oklahoma Statutes Title 12 complete PDF (§§ 109-113) - Oklahoma Legislature · Esch v. Turner & Company, Inc. (Okla. 2026) opinion (Justia)
- OregonOregon bars construction claims 10 years after substantial completion for homes and small commercial buildings and 6 years for large commercial ones, and residential owners must give written notice before suing.ORS chapter 12, incl. ORS 12.135, 2025 edition (Oregon Legislature) · Enrolled HB 3746 (2025), amending ORS 12.135 and 701.570-.585 (Oregon Legislature)
- PennsylvaniaPennsylvania bars claims against those who designed or built an improvement 12 years after completion, extended to 14 for injuries first occurring in years 10 through 12, with no fraud exception in the text.42 Pa.C.S. § 5536 text (Onecle) [secondary] · Spilman Thomas & Battle: A Look at the Pennsylvania Statute of Repose [secondary]
- Rhode IslandRhode Island bars tort claims against architects, engineers, contractors and suppliers 10 years after substantial completion, and because it reaches only tort actions, it may not bar contract claims.R.I. Gen. Laws § 9-1-29 (RI General Assembly)
- South CarolinaSouth Carolina bars construction claims of every kind 8 years after substantial completion, but not against anyone guilty of fraud, gross negligence or concealment, and residential defects require 90 days’ notice.S.C. Code Title 15, Ch. 3 (§§ 15-3-530, -535, -630, -640, -670), S.C. Legislature · S.C. Code Title 40, Ch. 59, Art. 7 (Notice and Opportunity to Cure Construction Dwelling Defects Act), S.C. Legislature
- South DakotaSouth Dakota bars construction defect claims 10 years after substantial completion, or 11 for an injury in year 10, excepts fraud and willful misconduct, and requires residential notice before suing.SDCL § 15-2A-3, S.D. Legislature · SDCL § 15-2A-7 (fraud / willful misconduct exception), S.D. Legislature · SDCL § 21-1-16 (residential construction defect notice), S.D. Legislature
- TennesseeTennessee bars claims against designers and builders 4 years after substantial completion, or 5 for an injury in year 4, excepts fraud and concealment, and its pre-suit notice law covers commercial property only.Tenn. Code Ann. Title 28 (Official Code of Tennessee, Release 72, 2020; §§ 28-3-202, -203, -205) [secondary] · Tenn. Code Ann. Title 66 (ch. 36, §§ 66-36-101 to -103) [secondary]
- UtahUtah requires contract and warranty claims within 6 years of completion and other claims within 2 years of discovery, capped at 9 years, with exceptions for fraudulent concealment and willful acts.Utah Code § 78B-2-225 (effective 5/12/2020), Utah Legislature
- VermontVermont has no construction statute of repose, so claims against builders and designers are limited only by 6-year and 3-year limitation periods with a discovery rule; a 2026 repose bill appears not to have passed.12 V.S.A. § 512, Vermont Legislature · H.589 (2026) bill status: six-year statute of repose, Vermont Legislature
- VirginiaVirginia bars injury and property damage claims against designers and builders 5 years after the work was performed, with no fraud or final-year exception, though equipment suppliers and owners in control aren’t covered.Va. Code § 8.01-250, Virginia Legislative Information System
- WashingtonWashington requires claims against licensed contractors and designers to accrue within 6 years of substantial completion or the end of services, and residential defects require 45 days’ notice before suit.RCW 4.16.300, Washington State Legislature · RCW ch. 64.50, Washington State Legislature
- West VirginiaWest Virginia bars contract and tort claims over deficient construction 10 years after the work, counted from owner occupancy or acceptance, and residential claims need 90 days’ notice before suit.W. Va. Code § 55-2-6a, West Virginia Legislature · W. Va. Code § 21-11A-8 (notice of claim), West Virginia Legislature
- WisconsinWisconsin bars claims against designers and builders 7 years after substantial completion, with 3 years for damage in years 5 through 7, and gives no protection for fraud, concealment or misrepresentation.Wis. Stat. § 893.89, Wisconsin Legislature
- WyomingWyoming bars tort, contract and indemnity claims against builders and designers 10 years after substantial completion unless the contract says otherwise, with 1 more year for an injury in year 9.Wyoming Statutes Title 1 (§§ 1-3-105, 1-3-110 to -113), Wyoming Legislature PDF
by trade.
- General contractorsOwners ask for completed operations additional insured for years after a project, and you’ll want the same from your subs so a later claim lands on the trade whose work caused it.
- PlumbingWater damage from a failed fitting or joint is the classic completed operations claim, often discovered months after the job.
- HVACInstalled equipment that fails, leaks or starts a fire after the job can come back as a completed operations claim against the installer.
- ElectricalFires traced to wiring or connections years after the work are a common source of completed operations claims for electricians.
- RoofingLeaks and interior damage after a roof is finished are why roofing policies are read closely for completed operations limits and exclusions.
where you’ll see it.
- Your policy declarations“Products-completed operations aggregate limit,” next to the general aggregate.
- Subcontract insurance sections“Completed operations coverage shall be maintained for a period of years after final completion.”
- Certificate requests“Additional insured status applies to ongoing and completed operations.”
- ExclusionsEndorsements excluding completed operations for residential, condo or specific kinds of work.
coverage that lasts as long as the work does.
Riza checks that your general liability keeps completed operations coverage for the work you do most, without exclusions that hit your main jobs, and that contracts asking for years of completed operations additional insured status line up with what your policy gives.
Get a quoterelated terms.
Coverage it touches: General liability